ASI worked with the Network Appliance team and the General Contractor Devcon Construction on this 120,000 sq. ft. five-story design/build office building with a 20,000 sq. ft. first-floor café and training center and a 900-ton rooftop water-cooled central plant. This fast-track design/build project required seamless coordination with all other trades. Formal Third-Party Commissioning of all MEP systems as performed at project close.

This project was also targeted by Network Appliance as their introduction to LEED building certification. ASI participated in the LEED design/implementation process in order to achieve LEED-certified status. HVAC LEED measures included demand-control ventilation, increased energy efficiency measures, and lighting control systems.

Project award was based on our bundled service proposal for commercial HVAC and plumbing scopes of work and ASI was the only MEP bidder capable of performing both commercial HVAC and plumbing design/build scopes of work.

The ASI project management and design team modified the original high HVAC design concept (packaged VAV equipment) to include a high-efficiency water-cooled chiller plant design. Revised rooftop chiller plant design concept became part of the written "Campus Design Specifications" for all future Network Appliance buildings.

Customer Testimonial

"Everything with our project went slick!"
      -Jeff Dilberger/Devcon Construction